Austin wins three-year truck body/bucket support contract from KGHM Sierra Gorda mine

Austin Engineering says it has strengthened its partnership with KGHM’s Sierra Gorda Mining (SGM) by securing a three-year truck body and bucket support contract with the operation in Chile.

Austin said: “Winning the competitive contract exemplifies the high level of confidence SGM has in Austin as their long-term partner of choice to support such critical mining assets.

“Our ongoing transformation from Austin 1.0 to 2.0 and the efficiencies being delivered as a result, was key to improving our South American team, to not only compete, but win such a long-term contract.”

Austin Engineering recently concluded a strategic review of its business that identified opportunities to cut “significant costs from the business while increasing output through adopting more advanced manufacturing techniques”, Austin CEO and Managing Director, David Singleton, said.

The Sierra Gorda copper-molybdenum mine is in the Atacama Desert, in the Antofagasta region, of Chile. It is located at an altitude of around 1,700 m and has a minimum annual average daily ore processing figure of 130,000 t.