News

BluMetric wins two new mining sector projects for $3 million

Posted on 9 Aug 2016

BluMetric Environmental has won two new projects in northern Ontario.  Generating combined revenues close to C$3 million over the next 18 months, the projects focus on analysis and restoration of mining sites. 

“In the mining sector, one of BluMetric’s key verticals, problem-solving using innovative approaches and tools is an important differentiator for us, and makes us an industry leader,” said Roger Woeller, CEO of BluMetric.  “Being chosen for projects like these clearly demonstrates that our wide range of capabilities is understood and appreciated by major players in the mining sector.  Effectively using the best available technologies, BluMetric is successfully evolving from advanced data collection and analysis to the provision and implementation of practical solutions.”

BluMetric will use innovative site investigation and analysis techniques, including the use of airborne equipment for geophysical surveys, to better direct field activity and monitoring.  BluMetric will also drill monitoring wells, perform aquifer tests, and take groundwater and surface-water samples.  Data collected during the project will be incorporated into the existing Geographic Information System (GIS)-based Environmental Information System developed by BluMetric.  BluMetric will use the results to identify and evaluate remedial and restoration options for the sites.

BluMetric Environmental has a portfolio of industry-leading engineering services and proprietary equipment providing sustainable solutions to environmental challenges.