Becker Mining latest chairlift design being installed at Tau Lekoa

Becker Mining South Africa’s Alrode manufacturing plant recently manufactured a chairlift system that is now being installed at Tau Lekoa Gold Mining Company’s mine near Orkney, in North West Province. “This contract encompasses the supply and installation of a new 180 m length chairlift system, which will run between the 800 and 900 levels and will operate at an inclination of 34°,” says Tom Searle, Becker Mining SA. “A 22 kW streamlined drive unit, with geometric precision for maximum use of balance and design strength, will be installed at the bottom of the decline.” The installation will be footwall mounted.

“Becker’s robust chairlift systems, with the latest technology and manufacturing trends, meet stringent quality and safety regulations in the mining sector. These modular, low maintenance chairlift systems are designed to transport up to 900 personnel per hour, quickly, efficiently and safely in all underground applications, including difficult mining conditions.” Safety features include a rope slip sensor and fail-safe brake system, as well as a passenger override sensor and an intelligent pull key system. This system can be supplied with dependable diesel driven generator sets to ensure safety in the event of power outages.” Installation of this chairlift system will be completed in December 2017 and commissioning will take place early in 2018.