News

Osisko completes Major milestone at Windfall gold project

Posted on 29 Jan 2020

Osisko Mining and Major Drilling have completed the longest diamond drill hole in Canada at the Windfall gold project in Quebec.

The Discovery 1 hole was a planned 3,000-3,500 m deep drill hole, designed to target two down plunge extensions of known gold zones and investigate the projected source area of the Windfall deposit at depth, Osisko said, adding that the working model for Windfall interprets an outer shell and centre of a possible porphyry intrusion feeding the Windfall-Lynx gold system.

The final length of Discovery 1 was 3,467 m, becoming the longest diamond drill hole in Canada, and achieving a vertical depth of 2,700 m from surface, the company said.

The hole was drilled from surface to 3,149 m with NQ rods and finished with BQ rods. Analytical results from the final 200 metres are at the laboratory, results are pending. The high value results from the hole are similar to those intersected in the Windfall and Lynx deposits, hosted in volcanics and felsic intrusions, with Discovery 1 ending in biotite and chlorite altered mafic volcanics with felsic porphyritic intrusions.

Osisko President and Chief Executive Officer, John Burzynski, said: “We are very proud of our Osisko team and Major Drilling for their tremendous work completing this hole. Successes include the discovery of the Underdog and Triple 8 extensions, the wide intercepts of anomalous gold values similar to those observed in the Lynx system, and now these new high value gold intercepts at depth. These results of the Discovery 1 hole show that the Windfall system is extensive with substantial room for potential growth.”