News

MineSense, Commerce Resources look at ore sorting options for Ashram REE project

Posted on 8 Oct 2020

Commerce Resources has started a test project initiative with MineSense as part of its ongoing collaboration with CanmetMINING.

The project with Commerce will include assessing the spectral response on 127 course analytical rejects from drill core, comprising five rock types associated with the Ashram rare earth and fluorspar deposit, in Quebec, Canada.

Of these 127 rejects, a total of 72 are from drill core within the Ashram deposit’s primary mineralised zone: the A-Zone. Based on the information collected, MineSense will be able to assess the laboratory-scale efficacy of its technology to the Ashram deposit material. If successful, a value contribution assessment may be completed as a follow up activity for the Ashram project.

MineSense specialises in digital technology solutions for ore-waste classification in real time at the mining stage (run of mine), thereby providing better grade control compared with that of the deposit block model or mine plan. It uses data analytics, combined with its trademarked ShovelSense and BeltSense technologies, to monitor mineralogical or grade changes in an orebody daily, as it is mined. This information allows for optimal ore blending, grade trend characterisation, and overall improved mine planning with resultant cost efficiencies.

The MineSense technology is based on X-ray Fluorescence sensors fitted to specific pieces of mining equipment to monitor the spectral response of the material being actively mined. The technology provides for a higher level of control compared with the typical ore sorting process which occurs at the truck scale in the process plant, Commerce says.

One of the standout deployments of ShovelSense is at Teck Resources’ Highland Valley Copper (HVC) operations in British Columbia.

The funding for the test work at Ashram is provided by Natural Resources Canada through CanmetMINING’s six-year rare earth element (REE) and chromite program (announced in April 2015), focused on developing new extraction technologies, addressing Canadian environmental challenges, and improving the knowledge of Canadian deposits, Commerce says. The company’s contribution to the collaboration is a supply of REE mineralised material from Ashram, in which several tonnes remain readily available from a bulk sample completed in 2012.

The Ashram deposit outcrops at surface, allowing for cost-effective collection of material for test work. As such, the company is actively engaging with various research and academic institutions to support the advancement of the rare earth element industry in Canada, and in Quebec specifically, it said.

The resource base at Ashram consists of 1.59 Mt of material averaging 1.77% total rare earth oxides (TREO) in the measured category, 27.67 Mt at 1.9% TREO in the indicated category and 219.8 Mt at 1.88% TREO in the inferred category. The preliminary economic assessment outlined a 4,000 t/d open-pit operation with a 0.19:1 (waste:ore) strip ratio over a 25-year mine life. Annual production averaged circa-16,850 t of REO over the life of mine.