First Ore Mining and Metso Outotec strike thickening plant deal for Pavlovskoye

The First Ore Mining Company (FOMC), part of ARMZ Uranium Holding Co, says it has signed a cooperation agreement with Metso Outotec “underlining the parties’ interest in continuing their strategic partnership in the design, supply, installation, control and commissioning of the thickening plant for the Pavlovskoye field”.

The agreement waas signed by Igor Semenov (right), Executive Director, FOMC JSC, and Markku Teräsvasara (left), Vice President, Metso Outotec.

The Pavlovskoye polymetallic deposit on the Novaya Zemlya archipelago is the largest such deposit in Russia with 47.7 Mt of ore reserves (2.49 Mt f zinc, 549,000 t of lead and 1,194 t of silver), according to First Ore Mining.

The cooperation with Finland’s Outotec (since merged with Metso to make Metso Outotec) emerged more than a year ago on the sidelines of the St. Petersburg International Economic Forum, which gave rise to an initial pact. Since that time, the company’s experts, together with Aker Arctic Technology, have elaborated a detailed draft design for the floating concentrator and set out a preliminary thickening flow chart and main equipment layout, First Ore Mining said.

In September, representatives from Metso Outotec visited the Pavlovskoye field. In the course of the field activities, the company examined the site for the planned thickening plant, tailings pond and infrastructure facilities, First Ore Mining said. It also acknowledged the ore samples were representative and could be used in testing.

The next stage within the partnership will include tests to be carried out at Metso Outotec Research Center in Pori, Finland. Once the work is completed and the final thickening flow chart is developed, Metso Outotec will present the guaranteed performance indicators and design values to ensure the plant’s productivity and the high quality of the concentrates and metal extraction for the ore types studied, FOMC said.

Semenov said: “I am confident that working together with Metso Outotec will significantly improve the thickening indicators for Pavlovskoye ores, which were obtained during the studies in the previous years. As a result, we will produce premium concentrates that are in demand in the global lead and zinc markets.”

Teräsvasara added: “Indeed, it is quite interesting to participate in the development of this unique project for processing minerals in the Russian Arctic. In addition to standard technological and economic matters, harsh weather conditions, lack of infrastructure, and high requirements to environmental safety in the vulnerable Arctic wildlife have made us search for the best available technologies to cover all these points.”

The Pavlovskoye project includes plans to build the northern-most mining and processing plant to produce lead and zinc concentrates, with First Ore Mining as the project operator.