News

Primero completes WHIMS project at Fortescue’s Christmas Creek iron ore op

Posted on 16 Feb 2021

Primero Group says it has completed the construction of a Wet High Intensity Magnetic Separation (WHIMS) processing plant at Fortescue Metals Group’s Christmas Creek iron ore mine in Western Australia.

The plant is expected to improve product grade and mass recovery from the desands unit at the Christmas Creek Ore Process Facility #2.

The flowsheet is based on a simple and robust configuration, where wet screen undersize at a nominal -1 mm is treated in open circuit through a low intensity magnetic stage, followed by a vertical WHIMS stage to produce a concentrate stream and a tailings stream, which can be integrated with the existing process and auxiliary equipment. The vertical WHIMS project entails the redirection of the wet screen undersize stream from the existing scrubbing circuit to feed the brownfield magnetic separation plant.

“We can proudly say that despite the impacts of COVID-19 and the fast-tracked nature of the project, the plant was successfully delivered and commissioned in less than 12 months – meeting all safety and project key performance indicators,” the company said.

Primero put the project’s success down partly to the “enhanced opportunity for collaboration early contractor involvement (ECI) provides”.

It added: “A flexible approach to project development that ensures the needs of all project stakeholders can be met prior to detailed design and implementation in a lump sum engineering procurement and construction (EPC) environment. This constructive, relationship-based contracting continued throughout construction, commissioning and now operation – demonstrating the power of the ECI contracting model when coupled with Primero’s unique, vertically integrated EPC capability.”