News

FLSmidth to deliver HPGRs for an Asia Pacific copper concentrator

Posted on 8 Feb 2024

Following a long-standing relationship with the customer, FLSmidth says it has received an order to supply comminution technologies to upgrade the customer’s copper concentrator at a mine site in the Asia Pacific region.

The order is valued at approximately DKK300 million and was booked in Q1 2024. The equipment is due to be delivered during 2025. The order includes the delivery of two High Pressure Grinding Rolls (HPGR) Pro, which are well known to be among the most energy-efficient comminution technologies available. In addition to the HPGRs, the order includes auxiliary equipment including an electrical and automation package, first-time spares and wear parts package, site supervision and training.

The original need for the HPGRs arose from the customer’s challenges of increasing ore hardness and decreasing metal grades as the mining pit deepens. The statement said: “To mitigate these challenges, the miner has chosen FLSmidth’s market-leading HPGR Pro technology due to its well-proven and energy-efficient design. Upon installation of the equipment the miner will benefit from increased throughput capacity, lower power consumption and extended roll life.”

“We always appreciate when existing customers place new orders with us. This illustrates the importance of good customer relationships and is a clear vote of confidence in our market leading technologies. This is our second large order for HPGRs within the past month, which I am very pleased about. It clearly underpins our market leading position in HPGR technologies and is fully in line with our MissionZero ambition,” comments Mikko Keto, CEO at FLSmidth.