The Mt Cattlin mine, owned by Galaxy Resources Ltd (part of the Allkem group of companies), is located in the Great Southern region of Western Australia. Having recommenced the operation in 2016 following a period of inactivity, the open pit mine produces high-quality spodumene concentrate for the global lithium market. The demand for this commodity is ballooning due to the role of lithium and lithium-ion batteries in mobile devices and in electric vehicles (EV), as manufacturers vie for leadership in the EV race. According to S&P Global Market Intelligence, it is forecast to jump from an estimated 504,000 t of lithium carbonate equivalent in 2021 to 641,000 t in 2022. With supply struggling to keep up, lithium prices are expected to be strong for years to come.
Mt Cattlin utilises a two-stage crushing system followed by Dense Medium Separation (DMS) gravity recovery as the primary spodumene concentration process. The operation faces the challenge, typical of lithium mines, of dealing with basalt contamination: due to its high density – similar to that of spodumene – this high-iron, barren material is also concentrated by the DMS, contaminating the final product.
Keith Muller, General Manager at Mt Cattlin explains: “For us, it’s key to mine as clean as possible, but there’s always going to be contamination, mainly associated with contact or when there are basalt intrusions into the pegmatite. In these cases, there’s still lithium present in what we are mining, but it’s heavily contaminated with basalt. We segregate that from our clean ore sources and we stockpile it to be processed at a later stage.”
Galaxy Resources has been stockpiling this material since 2016, while searching for an effective solution to treat it prior to processing in order to achieve a viable recovery level. In 2019, it installed optical sorters at the front-end of the plant to upgrade this low-grade ore. When it could not achieve the desired results, the company decided to explore other possible solutions with TOMRA Mining.
Successful test work at the TOMRA Test Center revealed that the TOMRA PRO Secondary Laser sorter would be an effective solution. TOMRA’s team was so confident of its performance, that it agreed on the very tight performance guarantees set by Galaxy Resources.
The sorter has been operating since 29 September 2021 sorting the contaminated low-grade ore. Keith Muller explains the process: “The ore is screened into two size ranges: 14mm to 25mm and 25mm to 75mm and then fed into the sorter. The sorter product is then recirculated into the crushing circuit, crushed down to a -14mm particle size and fed into the wet plant and DMS.”
Since the first day of operation, it has met and exceeded expectations: “Our target is to have 4% basalt in the product when it comes out of the TOMRA sorter; it has been consistently below this mark,” says Scott Green, Process Enhancement Coordinator.
“It’s been continuous, there hasn’t been a degradation in performance,” adds Muller. “It has worked well from the start and six months in it’s still performing as well as it did with the initial acceptance testing. We have pushed the boundaries of the industry standard in particle size and feed rate, and we haven’t found the limit of the machine yet.”
Matthew Bateman, Principal Metallurgist at Galaxy Resources agrees: “We have 1.2 Mt to treat, and we will have treated the best part of it in 9 to 12 months. With the TOMRA sorter, we are using far more contaminated ore than we would previously have processed.”
On the back of the TOMRA PRO Secondary Laser sorter’s success, Galaxy Resources has acquired a second unit to expand secondary ore sorting capacity.
It says installation was completed seamlessly despite the complications due to the COVID-19 pandemic, thanks to TOMRA’s careful planning and its team’s effective virtual support throughout the process. “In terms of commissioning, I was very surprised at how quickly and easily it went, especially with the constraints on travelling. When we commissioned the TOMRA unit, we still had border closures, so everything was done remotely, and it went very smoothly without any issues,” says Muller.
Green adds: “It can’t be said enough how valuable it was to have the availability of TOMRA’s team whenever we needed it, especially when you were remotely commissioning a machine we had never dealt with before.”
The training TOMRA provided for the Mt Cattlin operators and maintenance teams also contributed to the smooth start up. “Being shown the key points they have to look at, what to keep an eye on before they even started the machine, gave the operators the confidence that they knew the machine before they even turned it on. We’ve never had this from a supplier before,” explains Green.
In addition, TOMRA PRO Secondary Laser sorter is remarkably user friendly: “Operators like the simplicity of the HMI of the control panel, how simple it is to use. Once you get it up and running, it runs and runs and runs until you tell it to stop.”
Maintenance is another plus of the sorter: “We run the sorter 24/7. When we’re on the small size fraction we get a lot of mica, so it needs a clean every 1-4 hours, depending on how muddy it is. On the 75 mm fraction, we can go 6-7 hours without stopping to clean. And it only takes about 20 min, so it’s back up and running very quickly. In terms of routine maintenance, we use the opportunity provided by the scheduled weekly shut down for maintenance of the infrastructure to give it a thorough clean and check-up. That’s all it needs.”