HALMEK LITHIUM has selected Metso Outotec’s patented lithium hydroxide process for production of battery-grade lithium hydroxide at its greenfield plant in the Tula region in Russia.
The order value, which is not disclosed, has been booked in the company’s Metals June quarter orders received.
Metso Outotec’s scope of delivery consists of the engineering and key equipment supply for the lithium hydroxide process, the basis of which will be the Metso Outotec OKTOP® autoclave plant. The environmentally sound production process is one of Metso Outotec’s more than 100 Planet Positive products, the company said.
Pavel Galchenko, VP, Halmek Lithium, said: “One of the most important tasks in the project was the selection of technology. Instead of the more traditional sulphuric acid processing to produce lithium hydroxide, we decided to choose the Metso Outotec lithium hydroxide process as it is the most promising and environmentally-sound process at the moment.
“The pilot tests conducted at the Metso Outotec Research Center in Pori, Finland, provided excellent results.”
Mikko Rantaharju, Vice President, Hydrometallurgy business line at Metso Outotec, said: “Metso Outotec has developed lithium hard rock-related technologies for some 20 years now. It started with the battery-grade lithium carbonate process and, when the market changed to favour lithium hydroxide, the process flowsheet was converted to directly produce battery-grade lithium hydroxide monohydrate from spodumene.
“Both of the processes are patented and will be significant assets in our battery chemicals business, meeting the need to produce high-end lithium-ion battery chemistries for the growing market.”
HALMEK LITHIUM’s new hydrometallurgical plant, which will complement its existing lithium hydroxide plant, is currently under construction. As raw material, the new plant will use spodumene concentrate; it will feature a capacity of 20,000 t/y of battery-grade lithium hydroxide monohydrate, which is used in the production of batteries for electric vehicles. The first production line is planned to start up in 2023, and the second production line with a capacity of 20,000 t/y is expected to start production in 2026.