Tag Archives: Maria de Lourdes Bahia

SNC-Lavalin to help BAMIN join up mining and rail ops at Pedra de Ferro

SNC-Lavalin has been awarded a C$14.8 million ($11.4 million), two-year contract to provide design and engineering services for the Pedra de Ferro project in northeast Brazil for BAMIN, a wholly-owned subsidiary of ERG.

The Pedra de Ferro project involves an iron ore mining operation in the state of Bahia that extracts and processes two types of ore, hematite and itabirite, and transports it for commercialisation via rail and sea. To help increase capacity and expand production, the company will design and engineer an open-pit mine, a hematite processing plant, an itabirite processing plant, a product storage yard, a cargo loading station and a railway loop that will provide access to the West-East Integration Railroad (FIOL). In September 2021, BAMIN signed a concession agreement with the Brazilian Federal Government to complete and operate a section of the FIOL railway in the country. Once completed, FIOL will be able to carry 60 Mt/y of freight, with BAMIN’s products accounting for a third of this capacity.

“Our integrated pit-to-port approach is present at every level in the mining industry, including greenfield, brownfield, new investments, due diligence and assessment studies,” Cesar Inostroza, SNC-Lavalin Mining & Metallurgy CEO, said. “Whether it’s complementing existing operations or getting new ones up and running, we deliver safely on time and on budget.”

Maria de Lourdes Bahia, SNC-Lavalin Mining & Metallurgy Vice-president, Brazil, said: “This project is extremely important to the Brazilian economy, helping generate thousands of jobs and positioning Bahia to become the third largest iron ore producing state in Brazil. Our commitment to innovation, technology and sustainability enables us to deliver the best solutions with lasting benefits to our clients and the communities in which we work and live.”

ERG has previously flagged that Pedra de Ferro could produce up to 18 Mt/y of iron ore at full capacity.

SNC-Lavalin wins EPCM contract for NEXA Aripuanã polymetallic project

SNC-Lavalin has been awarded an engineering, procurement and construction management (EPCM) contract from NEXA Resources for its majority-owned Aripuanã zinc-copper-lead project in Mato Grosso, Brazil.

The Montreal-based professional services and project management company will deliver EPCM services for the project out of its Belo Horizonte office, in Brazil, and will include all operations required for copper, zinc and lead ore processing, including crushing, grinding, flotation, thickening, filtration and storage of concentrates and tailings, as well as load out of the final concentrated products and all related surface infrastructure, it said. The mandate also includes waste backfill, mine ventilation, and mine dewatering.

The Aripuanã project is an underground polymetallic mine and concentrate processing facility to extract zinc, copper and lead. Once completed, it will have an anticipated mine life of 13 years and a processing capacity of 1.8 Mt/y of ore per year, according to SNC-Lavalin.

The project’s zinc process flowsheet has been developed by considering conventional technologies for treatment, including sequential flotation for the recovery of zinc, copper, and lead as separate concentrates, according to NEXA.

SNC-Lavalin said the project will rely on “data-centric engineering” for development and design, and the use of immersive technologies for training operations personnel.

Work has begun and is slated for completion by the beginning of 2021.

Maria de Lourdes Bahia, General Manager of SNC-Lavalin Brazil, said: “Our Mining & Metallurgy sector has a long history in reimbursable EPCM services, and this award is testament to our continued recognition in this model of project delivery.

“This mandate is well aligned with our services-based strategy for mining and metallurgy projects. We look forward to continuing our trusted relationship with NEXA Resources in the successful execution of the project.”