Tag Archives: MP1250

Metso Outotec to deliver crushing, flotation and thickening tech to OZ Minerals West Musgrave

Metso Outotec says it has been awarded an order for the supply of key minerals processing technologies to OZ Minerals’ West Musgrave copper-nickel project in Western Australia.

The OEM’s scope of delivery includes an MP1250™ cone crusher, as well as Planet Positive classified flotation units and high-rate thickeners.

The TankCell® e630 flotation units (pictured) are the most proven large-scale cells in the 600 cu.m-plus category and come with the largest installed base of operating cells in the world, according to Metso Outotec.

Metso Outotec’s high-rate thickeners, meanwhile, were selected for their state-of-the-art technology and based on references from similar process plants, it said. Laboratory test work was conducted by Metso Outotec to aid thickener selection.

Kai Rönnberg, Vice President, Minerals Sales – Asia Pacific at Metso Outotec, said: “We are very excited to work on the West Musgrave project with OZ Minerals. We were able to align with the project’s key value drivers at an early stage and provide expert technical support.

“OZ Minerals has selected leading-class Planet Positive process equipment for their nickel and copper production process, and they will also be able to benefit from our extensive aftermarket capabilities and footprint in Western Australia.”

In September, the OZ Minerals Board greenlit the build of the West Musgrave copper-nickel project. The feasibility study the board signed off on detailed a 13.5 Mt/y operation with average production of circa-28,000 t/y of nickel and circa-35,000 t/y of copper over a 24-year operating life.

Metso Outotec introduces new ’Xtreme’ crusher head for Nordberg cone crushers

Metso Outotec has introduced a new crusher head to complete the portfolio for its Nordberg® MP800, MP1000, MP1250, HP800 and HP900 series of cone crushers.

The Xtreme (forged) head is the most robust head on the market, designed to handle the most demanding applications, according to the company.

Chad Smallwood, SVP Crushing Products at Metso Outotec, said: “Metso Outotec now has a complete range of crusher heads in the portfolio and our customers can choose the level of durability based on their application and needs. The new Xtreme forged head is the most reliable crusher head in the industry. The OEM design ensures optimal crushing even where equipment may be pushed beyond design limits.”

The new Xtreme head provides customers with an option for the most extreme conditions. The Xtreme head complements the Enhanced (heavy duty) head and the Elect (traditional cast) head in this range of crusher heads, Metso Outotec says.

The customer can match their price point and duty level to get the most life out of their components, according to the company. Maximising and extending the life of the components allows for a more sustainable operation overall.

Key benefits of the Xtreme head include:

  • Advanced geometrical features to assure consistent bearing loading within machine design parameters;
  • Complete one-piece forged material;
  • A sustainable design and capabilities to provide safe and reliable operations; and
  • Offers a three-year warranty.

Metso Outotec to supply Vertimills, cone crusher to IAMGOLD’s Côté project

Metso Outotec is to supply key comminution technology to IAMGOLD Corporation and Sumitomo Metal Mining’s joint venture Côté gold project, in north-eastern Ontario, Canada.

The delivery consists of two energy-efficient Vertimill® 4500 grinding mills (pictured) and one MP1250 cone crusher for the Côté gold project.

Andy Lingenfelter, Vice President, Minerals Sales, North & Central America, Metso Outotec, said: “Low energy and wear part consumption, as well as process flexibility, were decisive factors for the Côté gold project team when selecting the comminution equipment.

“Metso Outotec was consulted during the prefeasibility study and supported IAMGOLD on several projects. IAMGOLD’s technical team had solid confidence in the Vertimill technology, and they were also familiar with the high-performance capability of the MP crushers.”

The value of the order exceeds €10 million ($11.9 million) and has been booked in Minerals’ March quarter 2021 orders received.

Côté comes with estimated contained gold reserves of over 7 Moz. Construction of the gold mine commenced in late 2020, and is expected be completed in mid-2023.