Primero Group has been awarded preferred EPC status on a substantial contract with Strandline Resources on the Coburn mineral sands project in Western Australia.
The total volume of awarded engineering procurement and construction (EPC) works totals around A$150 million ($107 million), according to Primero, and follows an initial eight-week Early Contractor Involvement (ECI) process that provided further definition of the delivery strategy and project deliverables between the groups. It also coincided with the appointment of Mineral Technologies (MT), a global services provider and leader in the design and supply of mineral sands processing facilities (and a subsidiary of Downer Group), as the strategic technology partner alongside Primero for the project delivery.
Strandline said the contract involved the engineering, procurement, construction, commissioning and performance testing of the Wet Concentration Plant (WCP), Mineral Separation Plant (MSP) and associated processing circuits at the operation.
The Coburn WCP is designed to beneficiate the heavy minerals (ilmenite, leucoxene, rutile, zircon and monazite) and reject the non-valuable, lighter minerals through multiple stages of high capacity gravity separation and classification, according to Strandline. The rich heavy mineral concentrate produced from the WCP will be transported to the MSP and stockpiled ready for processing.
“The WCP infrastructure is relocatable and is planned to be moved several times during the mine life as the mine advances along the orebody,” Strandline said. “The MSP design comprises conventional electrostatic separation, gravity and magnetic fractionation to recover a range of premium-quality final products, including chloride ilmenite, rutile, premium zircon and zircon concentrate.”
The full project award is subject to Strandline Resources approving a Final Investment Decision in the coming months, Primero said. The ECI process came after Strandline’s recent A$18.5 million equity raising.
Primero Managing Director and CEO, Cameron Henry, said: “This award is an excellent example of Primero’s ECI phase in action and adds to our growing book of projects in preferred contractor status. We have worked intensively with Strandline over the past two months in designing a delivery solution that best meets the key project objectives and value drivers, while also minimising execution risks.”
Strandline has also already appointed Piacentini & Son to design and construct three mobile dozer mining units for the project, while Macmahon has been named as the principal contractor to provide site-wide civil and bulk earthworks construction services for the project.