Tag Archives: La Negra

Austin order book swells with mine truck body, bucket, water tank and chute contracts

Austin Engineering Ltd saw out 2021 with a bang, receiving over A$60 million ($43 million) of orders during November and December and ending the first half of its financial year with a strong order book, the company says.

At the end of November 2021, Austin’s order book was 19% higher than at the same time the previous year.

The new product orders are for over 100 truck bodies, excavator buckets, water tanks and mine chutes, in addition to repairs and maintenance works received across Austin’s operations in Asia Pacific, and North and South America.

Delivery of new products will be to Canada, the US, Mexico, Chile, New Zealand, Indonesia and both the West and East Coast of Australia.

The increased sales activity comes as Austin continues to progress a number of initiatives across its operating regions, it said.

Austin’s new facility at Fort McMurray in Alberta, Western Canada commenced operations on December 1, 2021. Four of seven truck bodies being manufactured on site have been completed and are ready for delivery to customers in the region. Alberta has one of the largest concentrations of heavy haul trucks in the world thanks to the nearby oil sands, and the new facility is ideally placed to provide a much enhanced local level of customer support to what was previously possible, according to Austin.

Austin will undertake a A$450,000 expansion of its La Negra facility in Chile to accommodate an anticipated increased workload in the second half of its 2022 financial year. The facility has been operating at high utilisation rates for some months now and a capacity expansion is deemed necessary. Austin expects the investment to be fully paid back in the second half of the financial year.

A recent expansion of truck body, final build and assembly locations in Eastern Australia and New Zealand has led to a competitively-won new order with global gold miner OceanaGold Corp in New Zealand with deliveries to commence shortly. The order for over 20 bodies uses Austin’s recently developed modularised truck body designs developed to overcome shipping logistics issues, with final build to be undertaken close to the mine site.

In addition, Austin’s previously announced partnership with Melter in Mexico has led to further orders for a large dragline bucket and other equipment, further reinforcing the strength of this regional relationship under Austin’s “hub and spoke” strategy being rolled out globally, the company said.

Austin CEO and Managing Director, David Singleton, said: “We are pleased to see increasing momentum in sales activity across the board for both new products and repairs, and the recent uptick in orders sets Austin up for a strong sales performance in the second half of financial year 2022. With a strong order book, and strong commodity prices, our facilities are operating at high levels of throughput as we start the new year. I am particularly pleased that our recent initiatives aimed at improving cost competitiveness and driving sales have so rapidly led to an increase in orders. It gives me confidence in our approach and forward strategy.

“In addition, we will be launching some updated products in the current half with improved efficiency and safety features which, we believe, will further cement our leading position in the mining products industry.”

Thiess bolsters Chile mining fleet with five Liebherr T 264 haul trucks

Thiess is expanding its 240-t fleet in Chile with five new electric drive Liebherr T 264 mining trucks, cementing its commitment to growth in the region.

Thiess’ Executive General Manager Americas, Darrell White, said the fleet addition would further bolster Thiess’ capability and deliver productivity and efficiency gains for clients.

“South America is essential to Thiess’ long-term growth and building our diversification into commodities such as copper and gold,” White said. “The T 264s boost our fleet numbers and provide our clients with the opportunity to increase production capacity.

“This commitment to new fleet follows our recent investment in infrastructure, which includes a dedicated maintenance workshop, and building workforce capability through in-house and industry scholarship and pathway programs.”

Liebherr Chile’s Mining Division Director, Dale Clayton, said the Liebherr partnership with Thiess spanned three decades and enabled new products to enter the market, including the recently upgraded T 264s to Chile.

“The T 264 truck has a 240-t nominal payload capacity and an impressive payload-to-empty-vehicle weight ratio, leading to faster acceleration speeds, better speed on grade and higher hauling capacity, resulting in shorter cycle times and a lower cost per tonne,” he said said. “The combination of a high-power Cummins QSK60 2,700 hp (2,013 kW) diesel engine with the extremely efficient Liebherr AC electric propulsion system allows for maximum productivity and reduced downtime.”

He added: “Our La Negra Facility and Reman Centre is well placed to provide spare parts and components as well as training and technical support, and our teams are experienced in servicing mining fleet in the unique conditions Chile offers.”

The T 264s will be manufactured at Liebherr Mining Equipment Newport News Co in Virginia, USA, and will then be shipped to Chile. Assembly of the trucks will take place at Liebherr’s La Negra Facility before being transported to site, ready for commissioning.