Tag Archives: lime

BQE Water achieves several firsts with Zhongkuang SART plant operation

BQE Water says it has advanced the SART plant it designed for a gold metallurgical facility owned by Shandong Zhongkuang Group Co Ltd, in China, to full production.

Located in the Shandong Province in eastern China, the plant is now being operated under the ongoing technical supervision of BQE Water.

Implementing SART (sulphidisation, acidification, recycling and thickening) at the site improves both the environmental performance and project economics of the metallurgical facility, BQE said. Specifically, the SART plant eliminates the need for cyanide destruction, recovers copper and zinc as separate sulphide concentrates, and recycles free cyanide recovered by the plant to gold leaching.

BQE was awarded the SART plant contract back in 2019 following the positive outcome of an engineering feasibility study and on-site testing completed by BQE Water earlier in the year.

The Zhongkuang SART plant also represents many firsts, according to BQE:

  • It is the first application of SART globally where the cyanide competing base metals, copper and zinc, are recovered simultaneously from the leach solution as two separate high-grade concentrates that can be sold to generate incremental revenues;
  • It is the first commercial scale application of SART in China;
  • It is the first SART plant where lime is used to control gas emissions to reduce operating costs and control the build-up of salts in the process water; and
  • It is the first SART plant to be integrated into a complex metallurgical flowsheet that combines mineral flotation with cyanidation and SART in a Zero Liquid Discharge metallurgical facility with complete water recycle.

Songlin Ye, Vice President for Asia at BQE Water, said: “We are very proud of our China-based operations team for this significant achievement and that they were able to do so considering the challenges associated with the COVID-19 pandemic. The Zhongkuang SART plant is our flagship project for the China gold sector and other gold producers in the country are taking notice.”

David Kratochvil, President & CEO of BQE Water, added: “The many firsts associated with the Zhongkuang SART plant demonstrates our leadership in SART technology. And through the unique combination of engineering know-how and operations expertise, the project also shows our ability to reduce risks and achieve predictable outcomes for our clients.”

Adbri wins cement, lime contract extension from BHP for Olympic Dam

Adelaide-based Adbri says it has won a four-year contract extension from BHP to keep supplying cement and lime to its Olympic Dam polymetallic operation in South Australia.

The aggregate value of the contract represents approximately A$160 million ($117 million) in revenue for the group over the full six-year term, it said.

Adbri, which has 160 plants and facilities across Australia, says the extension is in line with the existing contract terms and runs through to mid-2026, marking a 20-year supply relationship with BHP.

Adbri CEO, Nick Miller, said: “We are pleased to extend our long-term relationship with BHP at its Olympic Dam project, which demonstrates the strength of our integrated cement and lime position as well as our high quality and cost competitive product offering.

“We thank BHP for supporting a home-grown manufacturer over an imported product which protects local jobs and benefits the broader South Australian economy.”