Metso Outotec to deliver crushing, flotation and thickening tech to OZ Minerals West Musgrave
READ MORE
Metso Outotec to deliver crushing, flotation and thickening tech to OZ Minerals West Musgrave
December 22, 2022

Metso Outotec says it has been awarded an order for the supply of key minerals processing technologies to OZ Minerals’ West Musgrave copper-nickel project in Western Australia. The OEM’s scope of delivery includes an MP1250™ cone crusher, as well as Planet Positive classified flotation units and high-rate thickeners. The TankCell® e630 flotation units (pictured) are[…]

CiDRA to demo new separation tech to process coarse hydrocyclone underflow at Carrapateena
READ MORE
CiDRA to demo new separation tech to process coarse hydrocyclone underflow at Carrapateena
December 19, 2022

CiDRA Minerals Processing Inc and OZ Minerals Ltd have announced that they have entered into a Memorandum of Understanding that provides a basis of common understanding to commission a Front End Engineering Design (FEED) study for customisation and tie-in of CiDRA’s proprietary non flotation-based mineral separation technology for operation in a grind circuit rougher application[…]

Keliber to use Metso Outotec’s Planet Positive leaching technology at lithium refinery
READ MORE
Keliber to use Metso Outotec’s Planet Positive leaching technology at lithium refinery
December 19, 2022

Sibanye-Stillwater’s subsidiary Keliber has partnered with Metso Outotec to provide its sustainable soda pressure leaching technology for Keliber’s lithium hydroxide refinery, which will be built in Kokkola, Finland. Keliber owns the advanced lithium project located in the Kaustinen region of Finland, which intends to be one of the first integrated operations in Europe to sustainably[…]

Metso Outotec confirms Premier grinding mill order for West African’s Kiaka gold project
READ MORE
Metso Outotec confirms Premier grinding mill order for West African’s Kiaka gold project
December 16, 2022

Australia-based West African Resources has awarded Metso Outotec an order for state-of-the-art comminution equipment worth €30 million ($32 million) to be delivered to its greenfield Kiaka gold project in Burkina Faso. Metso Outotec’s delivery includes two Planet Positive Premier™ grinding mills with a total installed power of 27 MW, as well as Metso Outotec’s proprietary[…]