
Nordic Iron Ore has entered an engineering agreement with VB Elnät to determine the required measures for connecting its Blötberget project in Sweden to the electric grid. In order to re-start mining activity in Blötberget, Nordic Iron Ore needs access to a maximum capacity of 20 MW. The company has previously signed a letter of[…]